Drawing review for plumbing and fire protection

Count fixtures, measure pipe runs and check the tags on the plans against the fixture schedule.

104EXAM103EXAM104110'-0"12'-0"AHU-2ADESIGN DEVELOPMENT2026-08-29BPERMIT SET2026-09-18CADDENDUM 12026-10-09REV C 440 sq ft 260 sq ft 22'-0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Illustration drawn in the style of the product, not a screenshot.

Workflows that apply

Fixture counts and pipe lengths

Counts and lengths at the sheet’s scale, totalled by subject, space or layer; export to Excel.

Takeoff and estimating →

Tags against the schedule

The drawing checks compare fixture tags on the plans with the plumbing fixture schedule.

Drawing checks →

Riser review

Markups with statuses on riser diagrams, and RFIs pinned to the spot.

Markup and review →

An example from our sample set

On the sample Lakeside plumbing sheets, the drawing checks find tag LAV-2 on P-102, which the plumbing fixture schedule doesn’t list; the Count tool and symbol search total the fixtures per floor.

Our sample sets are generated, fictional drawings made for demonstrations.

Good to know

  • Hydraulic calculations are not part of Planspector.

Bring your next drawing set.

We are onboarding teams in early access. Tell us about your projects and we will set you up — or compare two drawings in your browser right now, no account needed.