P&ID review for industrial and process plants

Review P&IDs with the symbols your discipline uses, count valves and instruments, and turn review comments into tracked tasks.

WW-101 WET WELL P P-101A FIT 103 FIC 103 24"-RW-101-C1 FCV-104 Check the range I-001 says 0-25 MGD header: 12 MGD

Illustration drawn in the style of the product, not a screenshot.

Workflows that apply

P&ID symbols

A Tool Chest library of ISA-style instruments, valves, equipment and line symbols, plus IEC-style electrical symbols for single-lines.

Valve and instrument counts

Symbol search finds every symbol like the one you picked; matches become counts by sheet.

Takeoff and estimating →

As-built markups

Mark up field changes with statuses and photos; the history stays with the sheet.

Markup and review →

Review meetings with tasks

Present the P&ID in a live session, record decisions, and make tasks from markups with due dates.

Live review sessions →

An example from our sample sets

Our sample Northfield Water Treatment Plant set has a note on P-102 that says “SEE P-105 FOR FILTER BACKWASH SYSTEM” — there is no P-105, and the drawing checks say so. On P-103, one high service pump is drawn without the discharge check valve its twin has.

Our sample sets are generated, fictional drawings made for demonstrations.

Good to know

  • Planspector reviews P&IDs as drawings: it doesn’t extract line lists or instrument data from them.

Bring your next drawing set.

We are onboarding teams in early access. Tell us about your projects and we will set you up — or compare two drawings in your browser right now, no account needed.